Telecommunication sector is one of our specialty activities. In this context, GSM operations have fast transaction ability, specialty experience and common organism installation programs, urgent area support service, needed for local service which is partner in business as ready in market. At the beginning for Avea, after for Vodafone, Piem has installed and assembled container, lattice tower, monopole tower, antenna, cable, BTS, TRAU, BSC, repeater installations of hundreds of base stations in all of Turkey's regions and Piem is ready for requested those assets and new licensed operators.
If we declare with numerical
expression:
PİEM Energy has perfomed:
- 380 SWAP SITES,
-750 NEW GSM BASE STATIONS,
- 485 MW HOP,
- 30 BSC,
58 TRAU installations
DESCRIPTION
1-) VFTR Maintenance Partnership
a) Underground maintenance
b) Electronic maintenance
c) Periodic maintenance
d) Revision works
e) Energy consumption costs
2-) New Area Building-up
VIP Areas
• It is areas approved and declared, "preferential", by
employer. Difficult Conditional Areas
• Conditions are according to others more difficult and
wheras geographical that is areas. The number may be
about max. %4 (percent 4) of total area numbers in
region.
Standart Areas
It is all of areas that except difficult conditional areas.
2-) Fiber Optic Underground and Overground Works
CORRECTIVE MAINTENANCE
It is to provide continuance of Network systems
according to 7 days x 24 hours.
1 - Electric defect services
• To be removed AG / OG electric and infrastructure defects
• To be removed DC power supply defects
• EGenerator service to give in case of power outage
2 - Air conditioning systems defect services
3 - BTS and MW services
PREVENTIVE
MAINTENANCE
• AIt is included in infrastructure, energy, air conditioning
external alarm, transmission and antenna systems, Motorola
equipments (BTS/BSC/XCDR/PCU) and maintenance services and
inventory works which will take in declared periods related to
areas that made camouflage application.
• Areas are visited act of within as part of monthly plan in
regional level.
UNDERWORK
Period: Annual
• Tower
• Tube / Profile systems
• Container - Separation - Wall a partition
• Wire barriers
In connection with make of care VVorks to supply all of problems
confirmed and to be removed
TO PAID ENERGY COMSUMPTION COSTS AND FOLLOVVING OPERATIONS
•To implement operatıons to paid elcctric power comsumptıon
costs of central building and regarding Vodafone ali of area
equipments.
• To supply to take bank automatic payment instructıons.
• Areas of free automatic payment instructıon to paid eleetric
consumptıon costs by hand, complete and on time.
• To pay eletric consumptıon costs comlete and on time using
submeter on areas.







Provinces
which have building-up